Invitations Construction of a 400 kV overhead power line linking the Lagkada center of high voltage with the center of high voltage of Fillipoi [6/4/2016]
![]() Date of Issue: 6/4/2016 Total Budget: 10.850.000 Euros ![]() |
infoepan@mou.gr
801 11 36300